Certificate and Project Requirements for HVAC Insurers on Construction Sites

For HVAC subcontractors and insurers working on U.S. construction projects, proper certificate of insurance (COI) language and project-level coverages—especially Builders Risk and Contractors' Equipment—are mission-critical. This guide explains the on-site insurance requirements, common endorsements, estimated pricing, and practical steps HVAC insurers and subs must follow to stay compliant on jobs in major U.S. markets (New York City, Los Angeles, Houston, Chicago).

Why this matters for HVAC contractors and insurers

  • Owners and general contractors (GCs) require COIs and specific policy endorsements to shift risk and protect project values.
  • HVAC materials and temporary systems are high-risk assets: theft, water damage, fire, transit loss, and equipment breakdown can stop a project and create large soft-cost exposures.
  • Misalignment between a sub’s policies and the owner’s or GC’s builders risk can leave coverage gaps or deny claims.

Core certificate and policy requirements (what GCs/owners typically request)

Most GCs demand the following on the COI before permitting work to begin:

  • Commercial General Liability (CGL): $1,000,000 per occurrence / $2,000,000 aggregate minimum (often higher for large or high-risk projects).
  • Workers’ Compensation: Statutory limits for the job location.
  • Commercial Auto: $1,000,000 combined single limit when vehicles are used on site.
  • Builders Risk: Policy naming the owner/GC as insured or ensuring builder’s risk covers subcontracted HVAC materials in transit/storage/installation.
  • Contractors’ Equipment (Inland Marine/Equipment Floater): Coverage for tools, cranes, and temporary HVAC units on site.
  • Endorsements:
    • Additional Insured (AI) — scheduled GCs/owners with ISO CG 20 10 or equivalent.
    • Waiver of Subrogation in favor of owner/GC.
    • Primary & Noncontributory wording.
    • Per-project aggregate (when required by the contract).

Project-level: Builders Risk vs Contractors’ Equipment (quick comparison)

Coverage What it protects Typical limit Typical premium (U.S.) Best for
Builders Risk Project structure, materials in the course of construction (including installed HVAC when scheduled) Usually equal to completed value/contract sum 0.1%–2.0% of total contract value (varies by risk) [Sources: Insureon, The Hartford] Protecting the building & permanently installed HVAC
Contractors' Equipment (Inland Marine) Tools, cranes, temporary HVAC units, rigging, equipment in transit or between sites Insured value of equipment 1.5%–4.0% of equipment value per year (depending on schedule & deductible) [Source: Insureon] Protecting mobile/temporary HVAC equipment and tools

(See deeper coverage differences in: Builders Risk vs Contractors' Equipment: Which Insurance Protects HVAC Materials on a Jobsite?)

Sources for typical premium ranges:

Typical COI language and endorsements HVAC insurers must deliver

When preparing COIs for HVAC projects, ensure endorsements are attached or referenced with exact policy form numbers. Common required language:

  • Additional Insured: "The City of [X], [GC Name], and [Owner Name] are named as Additional Insureds with respect to liability arising out of the named insured’s operations.”
  • Waiver of Subrogation: “Carrier waives all rights of subrogation against [Owner], [GC].”
  • Primary & Noncontributory: “This insurance is primary and noncontributory to any other valid coverage available to the Additional Insureds.”
  • Per-Project Aggregate: “Per project aggregate limit applies to operations for [Project Name/Address].”

Administrative note: many carriers can issue electronic COIs with attached endorsements; confirm the AI endorsement is ISO or carrier-equivalent and that waiver language appears on policy endorsement, not just the COI form.

Pricing examples & market references (U.S.)

Real-world example: A $1,500,000 contract for a mid-rise renovation in Los Angeles might see builders risk premium estimates from $1,500–$30,000 (0.1%–2.0% of contract), while a $200,000 schedule of temporary HVAC units could carry an inland marine premium of $3,000–$8,000 annually (1.5%–4.0%).

Location-specific considerations (NYC, Los Angeles, Houston, Chicago)

  • New York City: GCs commonly require $1M/$2M GL, per project aggregate, and strict additional insured and waiver of subrogation language. Transit/theft exposures in NYC often push inland marine premiums higher.
  • Los Angeles / Southern California: coastal exposure and seismic risk can affect builders risk pricing; proof of earthquake or flood exclusion/endorsement may be requested.
  • Houston / Gulf Coast: hurricane and flood zones frequently require named-storm endorsements or separate wind/hail deductibles; inland marine rates may be higher for equipment stored outdoors.
  • Chicago / Midwest: winter weather exposures (freeze, snow load) increase builders risk claims for installed rooftop HVAC — plan for temperature-related transit/storage protections.

Valuation, deductibles, and settlement options for HVAC materials

  • Valuation basis should be explicit: replacement cost is preferred for HVAC components; ACV (actual cash value) can underpay older but essential assets.
  • Deductibles for builders risk typically range from $2,500–$25,000 depending on project size and carrier appetite. Contractors’ equipment deductibles commonly fall between $500–$5,000 per loss.
  • For large equipment losses, consider agreed value schedules to speed settlements.

For more on valuation and settlement choices, see: Valuation Methods and Settlement Options for Damaged HVAC Project Materials.

Coordination: GC, owner, and subcontractor policies

  • Establish primary responsibility in writing. HVAC subs should confirm whether the GC’s builders risk covers their installed materials or whether subs must insure via inland marine or a scheduled inclusion.
  • Run a discovery checklist: policy numbers, effective dates, limits, endorsements, additional insured forms, and contact info for claims reporting.
  • When overlapping coverage exists, use primary/noncontributory endorsements to avoid coverage battles.

Helpful guidance: Coordinating Coverage Between GC, Subcontractor and Owner Policies for HVAC Work.

Documentation checklist for HVAC insurers issuing COIs

  • Policy declarations page (if requested)
  • Additional Insured endorsement (attach copy)
  • Waiver of Subrogation endorsement (attach copy)
  • COI with project name/address and per-project aggregate language (if required)
  • Inland marine schedule or builders risk schedule (showing HVAC equipment values)
  • Claims contact and 24/7 reporting hotline

For operational best practices on protecting HVAC components during long projects see: Best Practices for Storing and Insuring HVAC Components During Long-Term Projects.

Actionable steps for HVAC insurers and contractors

  • Review the contract insurance requirements at bid stage; flag builders risk and equipment schedule needs.
  • Confirm endorsement language with the carrier—verbal assurances are not enough.
  • Maintain up-to-date COIs naming owner/GC and include all required endorsements before equipment is delivered to site.
  • Consider scheduled inland marine coverage for shipments and storage off-site.
  • Document chain-of-custody for high-value HVAC shipments (photos, GPS, delivery receipts).

References

For implementation details about adding HVAC equipment to a builders risk during installation, see: How to Add HVAC Equipment to a Builders Risk Policy During Installation.

Recommended Articles