When Design-Build HVAC Work Requires Both E&O and CGL Coverage

Design-build HVAC projects combine engineering, specification, and installation under a single contract. For HVAC contractors working in design-build settings in the United States — especially in markets like Texas, California, and Florida — the insurance picture often requires both Commercial General Liability (CGL) and Professional Liability (Errors & Omissions, E&O) to fully manage risk. This article explains when both policies are necessary, how carriers price the combined program, underwriting factors, and practical risk controls for contractors operating in these states.

Why design-build HVAC increases the need for E&O + CGL

  • CGL covers third-party bodily injury and property damage that arises from operations (e.g., a rooftop unit falling, refrigerant leak causing injuries).
  • E&O (professional liability) covers alleged design errors, specification mistakes, system performance shortfalls, or negligent advice that result in client financial loss (e.g., undersized equipment causing inadequate ventilation and higher utility costs).

When you design systems as part of a design-build contract, the project creates two distinct (and sometimes overlapping) exposures:

  • Construction exposures (installation defects, site accidents) — typically CGL.
  • Design and specification exposures (calculation errors, system performance failures, commissioning mistakes) — typically E&O.

If your scope includes both design and installation responsibilities, most owners, lenders, and larger GC partners will require proof of both policies — and they will often contractually require specific limits, endorsements, and certificates.

Contract triggers and common contractual requirements

Design-build contracts commonly specify:

  • Minimum limits, often $1,000,000 per occurrence / $2,000,000 aggregate for CGL.
  • Professional liability limits of $1,000,000 per claim (and sometimes higher: $2M–$5M) with a specified retroactive date.
  • Additional insured status for the owner/GC on the CGL policy, and waiver of subrogation.
  • Notice and claim-handling provisions (requiring prompt notice or notice within X days).

If you want specific contract guidance, see:

Key differences at a glance

Coverage Typical Trigger Covers Common Limits
CGL (Commercial General Liability) Bodily injury or property damage from operations Site accidents, third-party property damage, some product liability $1M/$2M or higher
E&O / Professional Liability Alleged negligent professional service or design error Design mistakes, undersizing, incorrect specs, commissioning failures $1M per claim / $1M–$2M aggregate (often higher for large projects)

For a more detailed breakdown, read:

How much does combined coverage cost? Real-world pricing examples

Premiums vary widely by revenue, scope, claims history, location, and contract language. Below are representative ranges and carrier examples (U.S. market, 2024–2025 estimates):

  • Small HVAC contractor (annual revenue <$500k; minimal design work)
    • CGL: $400–$1,200/year
    • E&O: $300–$1,000/year
  • Mid-size design-build HVAC firm (annual revenue $1M–$5M; regular design responsibility)
    • CGL: $3,000–$10,000/year
    • E&O: $2,500–$12,000/year
  • Large firms or high-risk projects (complex commission, hospitals, labs)
    • Combined program: $15,000–$100,000+/year depending on limits and retroactive date

Carrier price examples and resources:

Note: those online advertised starting prices typically apply to very small, low-exposure operations and vary by state (California and New York tend to yield higher premiums due to claim environments). Always obtain state-specific broker quotes for accurate pricing.

Underwriting factors that increase combined premiums

Insurers look at several items when pricing an HVAC design-build account:

  • Annual revenue and payroll
  • Proportion of revenue from design vs. installation
  • Project types (medical, data centers, labs are higher risk)
  • Contractual requirements (higher limits, waiver of subrogation, primary additional insured)
  • Claims history (closed and open claims increase premiums)
  • Experience and credentials of your design staff (PE stamp, licensed engineers reduce E&O exposure)
  • Quality control and testing/commissioning procedures

Practical steps to lower your E&O exposure (and favor better pricing)

  • Use clear scope documents and exclude “system performance guarantees” where practicable.
  • Limit design liability in contract language and set realistic performance standards.
  • Require owner acceptance of system parameters, specified test protocols, and a defined commissioning process.
  • Maintain written calculations, load reports, equipment selection logs, and commissioning checklists.
  • Purchase a policy with a favorable retroactive date (claims-made E&O policies need retroactive dates to cover prior work).
  • Institute pre-construction design review and third-party peer review on critical systems.

For contract-focused tactics, consult:

Claims scenarios — why both policies matter

  • Scenario A: Contractor installs HVAC that falls from roof, injures passerby → CGL responds.
  • Scenario B: Contractor designs a system that can’t maintain humidity in a museum, resulting in artifact damage and remediation costs → E&O responds for negligent design/specification.
  • Scenario C: A custom ductwork leak both damages neighboring property (CGL exposure) and reveals that a calculation error caused high static pressure and noise complaints (E&O exposure) → both policies may be implicated and coordination is required.

For lessons from past claims, see:

Buying strategies: bundling, brokers, and endorsements

  • Many carriers will offer both CGL and E&O but often on separate policy forms (different triggers: occurrence vs claims-made).
  • Use a broker experienced in construction and design professional coverages for HVAC — they’ll negotiate retroactive dates, policy limits, and relevant exclusions.
  • Consider higher limits or project-specific policies for large design-build projects.
  • Watch for professional services exclusions on CGL forms and ensure E&O policies don’t exclude installation-related design work.

For policy technicals like retroactive dates and exclusions, read:

State-focused considerations: Texas, California, Florida

  • Texas: Active construction market with strong demand for design-build services; competitive premiums but watch regulatory licensing for mechanical/HVAC engineers.
  • California: Higher litigation exposure and strict energy and code compliance — expect 10–40% higher premiums for comparable accounts and more frequent E&O scrutiny for energy modeling and Title 24 compliance.
  • Florida: Coastal projects and hurricane exposure can increase CGL and property components; performance guarantees in humid climates drive E&O interest for moisture and mold claims.

(Get multiple state-specific quotes. Regional market differences materially affect pricing.)

Closing checklist — what to present to carriers/brokers

  • Detailed revenue by service line (design vs. install)
  • Example contracts and client hold-harmless language
  • Copies of standard proposals and commissioning procedures
  • Resumes of design staff and PE licenses
  • Claims history (last 5 years)
  • Desired limits and retroactive date

Getting both CGL and E&O right for design-build HVAC projects protects your balance sheet, keeps you eligible for larger projects, and demonstrates professionalism to owners and GCs. Talk to a specialty broker, obtain state-specific quotes from carriers such as Next Insurance, Hiscox, or The Hartford, and tailor your contracts and risk-management processes before you sign design-build agreements.